- 11Retailer fill rate for a snacks brand fell to 78%. Trace and repair it.Supply chainMediumasked at PepsiCo25 min→
- 12A cash logistics firm wants 20% more ATM stops per van. Design the change.Route optimisationMedium22 min→
- 13A full-service restaurant loses weekend walk-ins to 45-minute waits. Fix throughput.Capacity managementEasy20 min→
- 142% of a vaccine distributor's shipments have temperature excursions. Eliminate them.Supply chain riskHard28 min→
- 15Demand exceeds a scooter plant's two-shift output by 30%. Add a third shift or expand?Capacity decisionHardasked at TVS30 min→
- 16A supermarket chain's shrinkage hit 2.8% of sales. Bring it under 1.5%.Loss preventionMediumasked at DMart25 min→
- 17A metro construction package is 8 months late at 60% completion. Recover the schedule.Project recoveryHardasked at L&T30 min→
- 18Diesel consumption at rural telecom towers runs 25% above modelled need. Investigate.Cost diagnosisMediumasked at Indus Towers22 min→
- 19Design the fulfilment plan for a 4x order surge in Diwali week.Surge planningHardasked at Amazon30 min→
- 20A state bus corporation's breakdowns per 10,000 km doubled in three years. Reverse it.Maintenance strategyMedium25 min→