- 11Operating theatres run at 55% utilisation yet surgeons complain of no slots. Resolve it.Capacity managementHard28 min→
- 12Serving villages below 2,000 population loses money for an FMCG firm. Make it viable.Network designHardasked at HUL28 min→
- 13A newspaper group runs 12 print plants at falling volumes. Consolidate the network.Network optimisationHard28 min→
- 14A cement firm's freight cost per tonne beats rivals by 8% the wrong way. Rebalance the mode mix.Logistics strategyHardasked at UltraTech28 min→
- 15Prepare a streaming platform's operations for a cricket final with 5x normal load.Surge planningHardasked at JioHotstar28 min→
- 16Digital adoption halved branch footfall. Redesign the branch network.Network optimisationHardasked at HDFC Bank28 min→
- 17A textile exporter quotes 90-day lead times; Bangladesh quotes 60. Compete.Lead time reductionHard28 min→
- 18A city loses 38% of pumped water as non-revenue water. Build the reduction plan.Loss reductionHard28 min→